Removing and Installing a Chassis
Step 8
Step 9
Step 10
Step 11
Packing a Defective Chassis for Shipment
Cisco 12010, Cisco 12410, and Cisco 12810 Router Installation and Configuration Guide
7-72
Connect the supplemental bonding and grounding connection (if there is one) to
the chassis (see
Supplemental Bonding and Grounding Connections, page
Connect the power cords to the PDUs on the rear of the chassis.
For AC PDUs, see
•
For 2400 W DC PDUs, see
•
page
7-48.
For 2800 W DC PDUs, see
•
page
7-48.
Power on the circuit breakers to the power supplies.
Power on the router.
Refer to
Chapter 5, "Troubleshooting the Installation"
on correctly.
Use the packaging that came with the replacement chassis to repack and ship the
defective chassis.
Step 8
of
Removing and Replacing an AC PDU, page
Step 11
of
Removing and Replacing a DC PDU,
Step 12
of
Removing and Replacing a DC PDU,
Chapter 7
Maintaining the Router
if the router does not power
OL-11496-01
3-28).
7-37.