Packing A Defective Chassis For Shipment - Cisco 12010 series Maintenance Manual

Hide thumbs Also See for 12010 series:
Table of Contents

Advertisement

Removing and Installing a Chassis
Step 8
Step 9
Step 10
Step 11

Packing a Defective Chassis for Shipment

Cisco 12010, Cisco 12410, and Cisco 12810 Router Installation and Configuration Guide
7-72
Connect the supplemental bonding and grounding connection (if there is one) to
the chassis (see
Supplemental Bonding and Grounding Connections, page
Connect the power cords to the PDUs on the rear of the chassis.
For AC PDUs, see
For 2400 W DC PDUs, see
page
7-48.
For 2800 W DC PDUs, see
page
7-48.
Power on the circuit breakers to the power supplies.
Power on the router.
Refer to
Chapter 5, "Troubleshooting the Installation"
on correctly.
Use the packaging that came with the replacement chassis to repack and ship the
defective chassis.
Step 8
of
Removing and Replacing an AC PDU, page
Step 11
of
Removing and Replacing a DC PDU,
Step 12
of
Removing and Replacing a DC PDU,
Chapter 7
Maintaining the Router
if the router does not power
OL-11496-01
3-28).
7-37.

Advertisement

Table of Contents
loading

This manual is also suitable for:

12410 series12810 series

Table of Contents