2. Connect tube ass'y
piping need to pull out to joint tube ass'y.
3. Set the piping direction.
(For bottom piping, need to perform cutting and flaring
process.)
4. Use 2 spanner to tighten the nut. (tighten torque 65 Nlm)
5. Check gas leak at joint area using tube connector
connect to liquid side piping. (Refer indication label at
chassis back for detail)
6. Cover the open tubing with the foam and bind it by
band
.
to gas side piping. Liquid side
7. Close back the chassis back piece.
(This can be used for left rear piping and left bottom piping
also.)
and
22