7
FINAL TASKS
1. Check all valve caps and ensure that they had tightened properly. Close the valve cover.
2. Fill gaps on the wall between hole sides and tubing with sealer.
3. A ttach wiring and tubing to the wall with clamps where necessary.
4. O perate the unit for no less than 5 minutes at heating or cooling mode.
5. Explain filter removal, cleaning and installation.
6. O perate the air conditioner together with the customer and explain all functions.
7. Give the operating and installation manuals to the customer.
APPENDIX A