Zhone MXK Hardware Installation Manual page 71

Table of Contents

Advertisement

zSH> shelfctrl monitor
Shelf uptime: 32 days, 23 hours, 53 minutes
Shelf Monitor CPLD version: 0.5
Shelf Monitor Firmware version: 0.5
Outlet temperature sensor: 23 degrees C (normal)
Fan Power A: normal
Fan Power B: normal
Power Supply A: normal
Power Supply B: normal
Fan status: OK.
System: Critical alarm set.
Card a: Critical alarm set.
Replacing the fan tray
1
Insert tray in the upper fan tray cavity.
2
By using firm pressure on either end of the fan tray, gently push the tray
back in an even manner, so the power connector of the fan tray seats
securely in the MXK chassis power connector.
Securely seat the fan tray to ensure proper cooling to the MXK unit.
3
Reinsert screws on either end of the upper activity lights facing and gently
tighten.
4
Verify the fans.
Once the fan tray is installed back on the chassis, you should see the
LEDs on the front powered on. You can also run the CLI shelfctrl
command to verify the fans are functional. The display for the shelfctrl
command shows the temperature, status for fan power and fan status
(shown in bold).
Replacing the fan tray for the 8U chassis
MXK Hardware Installation Guide
71

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents