Chapter 3 System Cables And Connectors; Guidelines For Cables - Zhone MXK Hardware Installation Manual

Table of Contents

Advertisement

S
C
YSTEM
ABLES AND

Guidelines for cables

C
This chapter explains how to connect the MXK cables and connectors. It
contains the following sections:
Guidelines for cables, page 55
Cable descriptions, page 56
MXK alarm cable and contacts guidelines, page 56
Fiber optic maintenance and optical connections, page 59
To be in compliance with NEC article 800, ensure that the power lines are
placed at least two inches away from the communication cables. This can be
accomplished by tie-wrapping and routing the power lines behind the rack
(route the communication cables in front of the rack).
Note: To comply with FCC regulations, cables and connectors must
be shielded. If you intend to install cable covers, the maximum height
of the connector head and cable should be two inches.
If the MXK is going to be installed in an inside plant, the cables must
be shielded and grounded at both ends.
MXK system connectors are located in the front of the chassis. No
cables are included with the installation kit. You must order any
cables that are required.
ONNECTORS
MXK Hardware Installation Guide
55

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents