I
NSTALL THE
Pre-installation preparation
Installation overview
MXK
This chapter describes how to prepare your site for installation and MXK
installation procedures and includes:
•
Pre-installation preparation, page 25
•
Install the MXK, page 35
Before installing the MXK, read the pre-installation preparations for
important safety, power, and environmental precautions and specifications
and have an understanding of the installation procedures. This section
includes:
•
Installation overview, page 25
•
General safety precautions, page 27
•
Installation precautions, page 29
•
Environmental specifications, page 30
•
Power requirements and specifications, page 32
•
Grounding and isolation, page 34
•
Select the system location, page 34
•
Tools needed, page 34
•
Compliance and certifications, page 35
Before preparing to install the MXK, it is helpful to review this overview of
MXK installation as it will take you from removing the chassis from the box
through installing and verifying uplink and line cards. After completing MXK
installation, refer to the MXK Configuration Guide for how to configure the
software that runs the MXK.
Installation overview
1
Install the MXK chassis.
MXK Hardware Installation Guide
25