Install the MXK
26
MXK Hardware Installation Guide
a
Unpack the system.
Unpack the system on page 35
b Carefully lift the chassis with the front of the chassis facing outward.
Install mounting brackets on page 36
c
Choose a rack position.
d Mount the chassis in a rack.
Mount the chassis in a rack on page 36
2
Connect power and provide ground.
Connect power and ground the chassis on page 41
3
Install uplink and line cards.
Install cards on page 38
4
Conduct visual hardware verification tests.
a
Visually inspect the chassis LEDs to verify that the power lights A
and B are green.
Read the LEDs on page 63
b Check to see that the uplink card's green active lights blink, then stays
on solid.
c
Check to see that the line card's active lights blink. (The amber fault
light should stay on when first starting up because the link card's
profile is not yet loaded.)
5
Conduct out-of-band management tests.
a
See
Log in to the serial (craft) port on page
b From the command line interface (CLI) enter the slots command to
verify which cards are installed.
6
Connect the cables.
Chapter 3, System Cables and Connectors, on page 55
a
Communication cables should be at least two inches away from
power lines. If the MXK is installed in an inside plant, the cables
must be shielded and grounded at both ends.
b Use Zhone cable mounting brackets where appropriate. Follow all
guidelines provided in
7
Perform basic MXK configuration tasks.
MXK Management on page 65
8
Provision the MXK.
a
Add card profiles for each card to be provisioned.
b See the MXK Configuration Guide for IP routing, bridging, and other
configuration tasks.
65.
Guidelines for cables on page
55.