Compliance And Certifications; Install The Mxk; Unpack The System - Zhone MXK Hardware Installation Manual

Table of Contents

Advertisement

Compliance and certifications

Table 7: Compliance and certifications
NEBS
Safety
EMC emissions
EMC immunity
Network

Install the MXK

Unpack the system

Specification
CSA 22.2 No. 950
UL 60950
FCC Part 15 Class A
CE EN55022A
CE EN55024
CE EN 50082
FCC Part 68
This section provides the information and procedures to install the MXK.
Unpack the system, page 35
Install mounting brackets, page 36
Mount the chassis in a rack, page 36
Install cards, page 38
Connect power and ground the chassis, page 41
Use the following procedure to unpack the MXK system components from
the shipping cartons.
Note: Before installing the MXK, read
on page 21
for important safety and power information.
On system receipt, check the shipping cartons for physical damage.
Unpack the shipping cartons, and check the contents for physical damage.
If the equipment appears damaged, immediately contact the shipping
company to file a claim.
The shipping company representative will give instructions on how to submit
a claim, where to send the unit, and any special instructions that may be
required.
If you need to return the equipment, pack the equipment in its original
packing materials and send it by prepaid freight to the address given by the
Install the MXK
General safety precautions
MXK Hardware Installation Guide
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents