Install the MXK

Grounding and isolation

Select the system location

Tools needed

Table 6: Equipment required to install the MXK system
Qty
Equipment
1
Mounting shelf or rack,
19 or 23 inch width as
required.
1
VT-100-compatible
terminal or PC used as a
VT-100 terminal emulator
1
11/32-inch nutdriver
1
Pliers
1
Cable prep tools
-
Cables
2
#1 and #2 Phillips-head
and 1/8-inch flat-blade
screwdrivers
2
Antistatic wrist strap
34
MXK Hardware Installation Guide
The MXK system cards and subassemblies use an integrated frame and logic
ground system as follows:
The MXK system chassis and logic ground are bonded.
The two-wire power supply feed is not connected to the chassis.
Cable shielding is terminated on the MXK system chassis ground.
Ensure that the environment is free of dust and excessive moisture, not
exposed to the elements or temperature extremes, and has sufficient
ventilation.
Install the system in reasonable proximity to all equipment with which it will
connect. Ensure that proper cable grades are used for all system and network
connections. For best results, use the cables and connectors recommended in
this document.
The required equipment listed in
the installation of the MXK system.
Details
Powered as indicated in attached
specifications.
Connected to the MXK through RJ45
craft port.
For ground stud hex nuts.
Pressfit and crimpers
N/A
N/A
Table 6
should be available before beginning
Use
MXK chassis mounting
Commission and configuration
General installation
General installation
Cable installation
System connections
Locking and unlocking cards,
front panels and chassis
brackets
Static electricity prevention

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents