Operation; Startup; Calibration - Flowserve PMV D20 Installation Operation & Maintenance

Digital positioner
Table of Contents

Advertisement

Example: DCS Compliance Voltage = 19 V
R
= 300Ω
barrier
R
= 25Ω
wire
CURRENT
Voltage = 19 V – 0,020 A(300Ω + 25Ω) = 12,5 V

9. Operation

9.1 General
The D20 is operated by the yellow button.
Depending on desired action, press the
button:
- during a number of seconds (Ex:
or
- a number of times. (Ex:
All operation steps are indicated by lit or
flashing LED(s).

9.2 Startup

Connect Air supply and a mA-simulator
to the positioner.
Warning: During calibration, the
actuator may stroke unexpectedly.

9.3 Calibration

Run 4 mA current as input signal.
Press the button for 5 sec. (Re-
lease the button when the three
LED:s start to flash alternately).
5 sec.
The calibration starts, the
actuator goes go to max. and
min. position and calculates the
control parameters.
The Calibration procedure will take
between 30 seconds and some minutes
depending on actuator size.
= 20 mA
MAX
)
x3
This system will support the PMV D20, as
the voltage 12,5 V is greater than the required
8 V.
)
5 sec.
Calibration
button
The three LED:s will flash alternately
during calibration.
After calibration all the three LED:s are
lit for a moment.
A successfull calibration is indicated by
yellow or green LED:
G
Green LED flashes = In service
Yellow LED flashes = In service.
Y
The unit vents in max or min posi-
tion.
An unsuccessfull calibration is indicated
by flashing red LED:
R
D20 does not reach the setpoint.
For other indications, see Error codes,
page 30.
25
ALARM
OPEN/CLOSED
CONTROLLING

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents