Configure Iscsi Ports; Configure Sas Ports - Dell SCv3000 Deployment Manual

Hide thumbs Also See for SCv3000:
Table of Contents

Advertisement

Steps
1
Review the fault domains that have been created.
2
(Optional) Click Copy to clipboard to copy the fault domain information.
3
(Optional) Review the information on the Zoning, Hardware, and Cabling Diagram tabs.
NOTE:
The ports must already be zoned.
4
Click Next.

Configure iSCSI Ports

For a Storage Center with iSCSI front-end ports, enter network information for the fault domains and ports.
Prerequisite
One port from each controller within the same fault domain must be cabled.
NOTE:
If the Storage Center is not cabled correctly to create fault domains, the Cable Ports page opens and explains the issue.
Click Refresh after cabling more ports.
Steps
1
On the Set IPv4 Addresses for iSCSI Fault Domain 1 page, enter network information for the fault domain and its ports.
NOTE:
Make sure that all the IP addresses for iSCSI Fault Domain 1 are in the same subnet.
2
Click Next.
3
On the Set IPv4 Addresses for iSCSI Fault Domain 2 page, enter network information for the fault domain and its ports. Then click
Next.
NOTE:
Make sure that all the IP addresses for iSCSI Fault Domain 2 are in the same subnet.
4
Click Next.
5
Review the fault domain information.
6
(Optional) Click Copy to clipboard to copy the fault domain information.
7
(Optional) Review the information on the Hardware and Cabling Diagram tabs.
8
Click Next.

Configure SAS Ports

For a Storage Center with SAS front-end ports, the Review Fault Domains page displays information about the fault domains that were
created by the Storage Center.
Prerequisites
One port from each controller within the same fault domain must be cabled.
The ports for each fault domain must be cabled to the same server.
NOTE:
If the Storage Center is not cabled correctly to create fault domains, the Cable Ports page opens and explains the issue.
Click Refresh after cabling more ports.
Steps
1
Review the fault domains that have been created.
2
(Optional) Click Copy to clipboard to copy the fault domain information.
3
(Optional) Review the information on the Hardware and Cabling Diagram tabs.
4
Click Next.
Discover and Configure the Storage Center
63

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scv3020

Table of Contents