Recommended Torque Values

Table 4-9 indicates torque values to be used for tightening the
fasteners indicated in these documents.

Table 4-9: Recommended Torque Limits

BOLT SIZE
BOLT TORQUE (N-M)
M4
3
M5
5.9
M6
10
M8
26
M10
50
M12
86
M16
200
M20
300

Ground Bus Installation

Ground bus splice and hardware are typically shipped assembled
at both sides of adjacent shipping packages.

Figure 4-24: Typical Ground Bus

BOLT TORQUE (FT-LBS)
2.2
4.4
7.4
19.2
Figure 4-25: Ground Bus – Plan View
36.9
63.4
147.5
221.3
Figure 4-26: Ground Bus – Rear View
SecoGear – Installation, Operation and Maintenance Manual 34 of 56