5.2.13
Connecting the Power Section cables between Transformer Cabinet and Filter
Cabinet
Description
The power section cables, which are connected to the reactor, are pulled back into the
transformer cabinet for transport and must be pulled out of the cable duct into filter cabinet on
site and connected to the appropriate lugs.
Each lug and the associated power section cable have identical markings to prevent wrong
connection.
The required assembly material is included.
SINAMICS PERFECT HARMONY GH180 6SR41 manufactured in NMA Nuernberg, Germany
Operating Instructions Rev.201706301306
Assembly
5.2 Assembly instructions
97