3 – INSTALLATION:
a) Included parts, materials and required tools for installation:
-Appliance and designated parts are : hearth insulated support, spark-guard,
fire bricks, fire back protection, 3 (or 4, in central situation) sides top cover,
polished raw steel flue pipe, separable handle, and focus kit (heat protective
glove, mounting gloves, Zebraline© renewing wax tube, manual).
-Required tools: drill, M8 allen key, level, screwdrivers, M12 key, scaffolding
(up to underceiling height), refractory compound.
-2 persons minimum are required for installation.
b) Options:
• custom ceiling cover disc (polished raw steel steel disc)
• focus flue extension
c) Assembly details:
Page 11 of 24