3 – INSTALLATION:
a) Included parts, materials and required tools for installation:
- Appliance and designated parts are : firebox, grate (neofocus), integral
grate (gigafocus) ash drawer (néofocus), fire back protection, spark-guard,
separable handle, 12 inch adaptor, baffle and focus kit (heat protective glove,
mounting gloves, touch-up paint can, manual).
- Required tools: drill, M8 allen key, level, screwdrivers, M12 key, scaffolding
(up to underceiling height), refractory compound.
- 2 persons are required for Neofocus installation. Gigafocus : 4 persons.
Page 11 of 28