Page 2
This document introduces the installation and debugging steps of CW0100 outdoor CPE equipment, which is used for guiding installer to install CPE correctly. Copyright Notice BaiCells copyrights this specification. No part of this specification may be reproduced in any form or means, without the prior written consent of BaiCells. Disclaimer This specification is preliminary and is subject to change at any time without notice.
Page 4
Contents of Figure Figure 2-1 Appearance of CW0100 ................5 Figure 2-2 Install on pole A ................... 7 Figure 2-3 Install on pole B ..................8 Figure 2-4 Mounting Hole of Install on Wall ..............8 Figure 3-1 Strip Shielded Twisted Pair ................. 9 Figure 3-2 Separate the metal net, wire of cable and aluminum foil layer ....
Page 5
Contents of Table Table 2-1 CW0100 Interface and button ..............5 Table 2-2 LED Indicators ....................6 Table 2-3 RF Specification ................... 6 Table 3-1 Lightning Protection Demand of Cable ............15...
1. Installation Preparation Out-of-Box Audit Before opening the box, make sure the packaging cases are in good condition, undamaged and not soaked. During the unpacking, avoid potential damaging impacts from hits or excessive force. Check whether the material in the box is consistent with “Shipping List” and is in good condition and undamaged.
Figure Name Shielded CAT5 twisted pair The length of the cable is tailored according situation installation site. Plastic tie Grounding wire Installation Tools The following tools are needed during the installation. Standing wave Nipper pliers Diagonal pliers Pincer pliers Ethernet cable measuring tester instrument...
Wrench Electroprobe Electric soldering Ladder iron Installation Environment According to “Reconnaissance Report”, check whether the external environment of installation site is ready. Safety Protection Construction personnel must conform to “Construction Safety Specification”, wearing safety protection guard, such as safety belt, safety helmet, gloves, and wrist strap, and so...
2. Equipment Installation Appearance The appearance of CW0100 outdoor CPE is smart, the dimension of CPE is 245mm x 135mm x 42mm, the weights of CPE is 600g. The appearance is shown in Figure 2-1. Figure 2-1 Appearance of CW0100 CW0100 CPE support installing on pole or installing on wall.
LED Indicators Table 2-2 LED Indicators LED Name Description Color LED Behavior Status Indicator Power Green No Power Supply Indicator Steady On Power On LTE Signal 3 LTEs, Green All OFF No Connected Indicate ALL blanking Connecting connection One LED Steady On Connected, the signal state and is weak...
Install on Pole Installing on pole have three methods: traditional on pole, telegraph on pole and iron on tower. Traditional on pole: Required diameter of the pole is 25mm to 45mm. Telegraph on pole: If the pole is telegraph, you need to install a pole that length is over 700mm and diameter is 25mm to 45mm as the mounting bracket.
Fasten the screw using screw driver Install on Wall When CW0100 installs on wall, the installation method is as follows: On the wall, fix two big head screw which distance is 52mm, and then hang the CPE on the big head screw.
3. Wire Connection Make Ethernet Cable Connector CW0100 outdoor CPE need to use shielded CAT5 twisted pair, the operation steps of making connector is as follows:: 1. Before making the RJ-45 shielded connector, strip the outer Jacket of the twisted pair about 30mm using crimping tool, which is shown in Figure 3-1.
Figure 3-3 Cut off the aluminum foil layer of twisted pair The mode of connection is standard straight through cable. The color order is white/orange, orange, white/green, blue, white/blue, green, white/brown, brown, which is shown in Figure 3-4. The color order is important to get corrected. Figure 3-4 Color Order Insert the eight wires into the line card according to the color order, shorten them to a suitable length (about 12 mm) using diagonal pliers, as shown in Figure 3-5.
Figure 3-6 Insert line card into Connector 7. Crimping the cable using crimper, as shown in Figure 3-7. Figure 3-7 Crimping connector Impact the metal part of the shielded connector tail with the metal net shielded layer of the Ethernet cable using nipper pliers, as shown in Figure 3-8. Figure 3-8 Impact the connector with cable shield layer...
9. Cut off the redundant part of metal net using diagonal pliers, as shown in Figure 3-9. Figure 3-9 Cut off the redundant part 10. After the completion of shielded connector making, as shown in Figure 3-10. Repeat all the steps and wire color on the other end of the cable. Figure 3-10 Completion of shielded connector 11.
is normal. In the tester, if eight signal indicator and grounding indicator flash green in turn, it indicates that the Ethernet cable is normal. If any signal indicator is red or yellow, it indicates that there is circuit break or bad contact. You need to make a new connector again.
Power On CW0100 outdoor CPE is powered with POE. CPE provides standard POE power interface conformed to IEEE 802.3af standard. The 4, 5 (+), 7, 8 (-) wire have direct current. Before power on, test whether there is voltage output and whether voltage output is inverse with multimeter.
Figure 3-13 POE power Mode Lightning Protection of Cable It need to use shielded cable and ensure the grounding of two ends of equipment. If the opposite equipment has plastic enclosure, which cannot be grounding. In this situation, the shielded cable function is decreased largely. If its available, it is recommended that Ethernet cable and power cable pass through metal sleeve to ground separately.
After CPE powered on, waiting for 2 minutes, connect the Ethernet port of PC to POE adaptor. The CW0100 CPE default IP address is 192.168.1.1. Set the IP address of PC is 192.168.1.2, ensure that the Ethernet indicator get light and ping CPE IP address normal.
5. Regulatory Compliance FCC Compliance This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.
Page 22
IC Compliance This device complies with Industry Canada licence-exempt RSS standard(s). Operation is subject to the following two conditions: (1) This device may not cause interference, and (2) This device must accept any interference, including interference that may cause undesired operation of the device. Le présent appareil est conforme aux CNR d'Industrie Canada applicables aux appareils radio exempts de licence.
Appendix A CPE is unable to power on Check whether POE power is connected normal. Check whether the Ethernet cable is damaged and wire order is correct. CPE service is unable to running Check whether it is correct that the network normal configuration of CPE.