Installation guide Thermal Energy Meter Superstatic 789 of a high-tech composite
Installation
The prescriptions related in the standard EN1434-6 must be respected when the Superstatic 789 is installed.
In the standard version, the integrator is parameterised by default for installation on the "cold" pipe side. Installation on the "hot" pipe side must be specified
with the order.
Depending on version and use (heat and/or cooling meter), the energy meter must be fitted on the "cold" or "hot" pipe side of the installation in
compliance with the chosen configuration. If the device was ordered with the configuration option, some parameters can be changed using the
"Config" menu during commissioning.
In a same installation, mixed mounting positions (horizontal and vertical) can be realized.
Place the flow meter correctly according to the direction of the fluid (an arrow  can be seen on the flow meter).
Horizontal mounting with the integrator facing downwards is not permitted. Also avoid fitting in a position which may cause an air bubble to build up inside
the mechanical meter.
The energy meter must be fitted between two shutoff valves. The flow meter must be installed ahead of any monitoring valves so as to avoid any potentially
interfering influence. Waterproof will be checked at the various mounting points.
The heat conveying liquid must be equivalent to water without any additives according to standard FW510 of the AGFW (German District Heat-
ing Association). If additives are added to the water, the user must ensure the compatibility of the materials used in the thermal energy meter which are in
contact with these additives.
The integrator can be separated from the flow meter and installed at a sufficient distance from the flow meter if:
-
The meter has to be installed in a confined space.
-
In a cooling installation, possibility to isolate the flow meter.
The pipes are generally free from air before the installation is brought into service. Follow the insulation instructions for cooling installations. Final commis-
sioning must be performed and documented.
After mounting and before commissioning purge system > 10 min at qp to avoid air bubbles.
Wall-mounting of the integrator
The integrator can be separated from the flow meter and fixed against a wall using the wall fixture supplied with the energy meter. If possible, install the
wall fixing component above the flow meter.
The wall fixing component, together with a double-sided adhesive tab, is delivered with the Superstatic 789 (Figure 1).
The wall fixing component can also be screwed on to the wall (screws are not supplied).
To separate the integrator from the flow meter press laterally with one hand on the two locking buttons, while pulling the integrator upwards (Figure 2).
Fix the integrator onto the wall fixing component taking care not to jam the cable which connects the integrator to the flow meter and stick the adhesive tab
behind the wall component. Secure the assembly to the wall (Figure 3).
Figure 1
To remove the integrator from the wall support, it will be sufficient to press laterally on the two locking buttons while pulling the assembly towards you.
Rewind the connection cable at the position provided for this purpose on the flow meter (1) and re-insert the integrator (2).
0789P300-E Installation Superstatic 789 EN 26-05-2016
Horizontal Mounting position: The sensor head MUST be placed to the side +/- 45° in
relation to the pipe axis to avoid influences of air inclusions (top) or dirt (bottom).
Vertical mounting position: Mounting in riser or down pipes possible.
Figure 2
(2)
1
Figure 3
(1)
Sontex SA, 2605 Sonceboz, Switzerland

Advertisement

loading
Need help?

Need help?

Do you have a question about the Superstatic 789 and is the answer not in the manual?

Questions and answers

Summary of Contents for Sontex Superstatic 789

  • Page 1 The wall fixing component, together with a double-sided adhesive tab, is delivered with the Superstatic 789 (Figure 1). The wall fixing component can also be screwed on to the wall (screws are not supplied).
  • Page 2 The temperatures of use shown on the label must be respected. A temperature sensor may be fitted directly in the Superstatic 789 flow meter. The temperature sensors will preferably be fitted directly, in other words one temperature sensor will be fitted in the flow meter while the other sensor will be installed on the other side of the heat exchanging circuit.
  • Page 3 The compact thermal energy meter Superstatic 789 is a precision measuring instrument approved for individual metering of heating systems and must be handled with care. The Superstatic 789 is available in a heating or cooling version and determines the thermal or cold energy exchanged by a heat-bearing fluid in a heat exchanger circuit.
  • Page 4 To complete the functional analysis, the commissioning protocol can be saved using the Prog7x9 software via the optical interface. 0789P300-E Installation Superstatic 789 EN 26-05-2016 Sontex SA, 2605 Sonceboz, Switzerland...
  • Page 5 Error codes The Superstatic 789 integrator displays an error message with the 3 letters “Err” and a code. If several errors occur at the same time, the different codes are added together. The error is displayed in the first position of the display menu. It will still be possible to select all the other display menus by pressing the navigation button.
  • Page 6 1.04 SW version Kurzes Drücken / Pression courte / Short pression on button Segmenttest Test des segments Langes Drücken / Pression longue / Long pression on button Test LCD 0789P300-E Installation Superstatic 789 EN 26-05-2016 Sontex SA, 2605 Sonceboz, Switzerland...
  • Page 7 The powered remote M-Bus communication interface is a serial interface which permits communication between different M-Bus devices via a central M- Bus station (per example: Sontex 634). For this communication interface to be available, it must be specified when the order is placed. The powered re- mote M-Bus module will therefore be installed and configured in the factory.
  • Page 8 This is the only way of preventing malicious interference. Position of the seals: Seals installed in the factory (1) on flow meter and temperature sensor of the Superstatic 789 The detector support fitted on the flow sensor can’t be removed without being damaged or broken.
  • Page 9 Comp = high-tech Composite : In the pipeline, values must be confirmed The flow sensor Superstatic 789 can be operated from 0,8 bar in the pipe; 16 bar = 1.6 MPa Length of straight section fitted upstream/downstream of each flow meter (EN1434):...