ASSEMBLING OF IP X4/44 HOUSING

Assembling of the cable connector(s) and cover (see Fig. 3. and Fig.
5.)
Use cable with Ø 5 ... Ø 7 mm.
Strip length cable: 15 mm
Grommet inlet nunmbers1, 2, 4 applicable for cable
with Ø 5 ... Ø 7 mm.
Grommet inlet number 3 applicable for cable
with Ø 4 ... Ø 7 mm.
Mount the connector(s) and bring the cable grommet in
position over the cables and connector.
Assembly of strain relief for IP X4/44 protection (see Fig. 4. and Fig.
5.)
Position the cover on the ignition control Then, when holding
the cover down (in direction A) rotate it to mount the cable(s)
in the strain relief (in direction B).
Place the gasket on the pins of the gas control and finally fix
the whole assembly (ignition control and cover) with a screw
on the gas control wit a torque of 40 Ncm max.
Use sleeves to connect the flame sensing wire and sparking
connection(s).
In case the spark plug connections are not accessible,
additional means for electrical protection need to be provided
by the boiler manufacturer if IP 44 is needed. The spark plug
connections must not be removable without the use of a tool.
EN2R-9031 0402R15-NE
Connector
Cable grommet
2
1
Fig. 3.
Special housing for IP X4/44
4
3
Sleeves
8
A
B
Fig. 4.
Gasket
Fig. 5.
Fixing screw
Cap
Cable grommet