Freewing F-104 Starfighter User Manual page 11

755mm wingspan/ 1720mm length
Hide thumbs Also See for F-104 Starfighter:
Table of Contents

Advertisement

Gear Door Installation
Nose and main gear door Installation
Assemble, disassemble and replace the nose/rear landing gear doors by referring to the following photos.
Nose Gear Door Installation
A-17g servo
B-
Servo hard point.
C-Screws
(PWA2x8mm 2pcs)
A
Main Gear Doors
A-Screws
(PWA2x8mm 2pcs)
B-Servo hard point.
C-LED light
(PA2x8mm 1pc)
D-Screw
E-
Gear Door rotating shaft
F-
Rear Gear Door (left/right)
G-
Gear Door pushrod
H-Servo
Step
2
Nose cabin door pushrod size
Pushrod diameter:Ø1.2mm
33mm
(1.3 in)
Rear cabin door pushrod size(2pcs)
Pushrod diameter:Ø1.2mm
41.5mm
(1.63 in)
F-104S Starfighter
Item No.:FJ310
Step
B
C
Step
Step
C
D
Servo pushrod installing hole
1
2
3
4
5
Servo pushrod installing hole(2pcs)
1
2
3
Step
1
2
A- Gear door rotating shaft
B- Nose Gear Door
(left/right)
C- Servo
B
A
1
3
H
E
G
Rotating pushrod,can increase
or reduce control distance.
EN
D
C
B
A
F
1
2
3
2
3
4
10
R

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents