Unpacking The Switch; Cooling Requirements - Brocade Communications Systems SilkWorm 2400 Hardware Reference Manual

Table of Contents

Advertisement

Chapter 2 Installation

Unpacking the Switch

While unpacking the switch, check to make sure the following items are included:
Switch unit
Requested GBIC modules
Accessory kit containing the following:
Power cord, if ordered
Manuals, if ordered
Optional Software Feature Guides, if a feature(s) is ordered
Rubber mounting feet
Save packing materials in case you need to return the switch. Refer to Appendix B,
Switch Support for information on contacting Brocade.

Cooling Requirements

Cooling air is drawn into the chassis by six fans mounted near the rear of the chassis,
venting exhausted air through the front of the switch.
NOTE:
free access to ambient air for cooling.
2-2
Do not block the front or rear air vents. The switch must have

Advertisement

Table of Contents
loading

Table of Contents