You will also alter the existing
Creating the New Nodes
Create the new nodes by completing the following steps:
Figure 100. The Repositioned Collect Data Nodes
User's Guide
•
A new
node that will prompt the user to enter a quantity
Display
value after an item number is entered
•
A new
node that will use a template to store the quantity value
Input
in a register field
•
Two
nodes that will display the last-entered item and quantity
Output
values as a pair
1. If PPG is not already started on your PC, from the Windows
menu, select
Programs > PT Program Generator > PT Program Gener-
to load PPG.
ator
2. Select
File > Open
file. (Your screen will have Links not shown in
node to use a template.
Input
from the menubar to load the tutorial.scr
Creating and Using Templates
Start
.)
Figure 100
129
Need help?
Do you have a question about the PT Program Generator and is the answer not in the manual?
Questions and answers