Download Print this page

ADJ 3D Vision User Instructions page 4

Advertisement

3D Vision
When installing the unit, the trussing or area of installation must be
able to hold 10 times the weight without any deformation. When
installing the unit must be secured with a secondary safety attach-
ment, e.g. included safety cable. Never stand directly below the unit
when mounting, removing, or servicing the unit.
Overhead mounting requires extensive experience, including calculat-
ing working load limits, installation material being used, and perodic
safety inspection of all installation material and unit. If you lack these
qualifications, do not attempt the installation yourself.
The installaiton should be checked by a skilled person once a year.
To connect your 3D Visions to one another you can use a quick
release panel lock (sold separately). To use the quick release panel
lock simply squeeze the ends of the quick release panel locks inwards
and attach to one of the six outer rigging bar attachment points. You
can use a pro clamp with 10M bolt attached to the rear middle of the
unit (as seen below) to attach to trussing. See the next page for all
rigging areas and quick release connections.
ADJ Products, LLC - www.adj.com - 3D Vision Instruction Manual Page 6
Mounting and Grouping
3D Vision
3D Vision
Check the rear of the unit for the word TOP to locate the top of
the unit. The top of the unit is Pixel 1.
Pixel 1
ADJ Products, LLC - www.adj.com - 3D Vision Instruction Manual Page 7
Mounting and Grouping
10M threaded mounting hole
(to attach pro clamp to lock on truss)
quick release panel lock
to connect adjoining panels
crosshole (to
hang on a stud or
hook)
Rigging bar attachment points
Pixel Layout
Pixel 2
Pixel 3

Advertisement

loading