Installing The Sf/Cpm - Alcatel 7450 ESS-7 Installation Manual

Mpls-enabled carrier ethernet platform
Table of Contents

Advertisement

C
ONNECTING THE
Table 25: AC Power Cord Specifications
Wire type
Conductors
NOM O.D.
Rating
Supply end
Equipment end
Follow these steps to connect the AC power cord.
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
7450 ESS-7
AC P
OWER
Figure 25: AC Power Cord Example
Component
14 AWG 3 SJT
North American
.360-.395
15A/250V
NEMA-L6-15P
IEC-60320-C19
Locate your AC power cord(s). Verify that the cords meet your regional requirements. Do
not use cords that do not meet these standards.
Plug the cords into the receptacle on each AC PEM.
Engage the cord retainer by engaging the retainer bracket toward the power cord and snap
the bracket in place (see
from being accidentally pulled out.
Plug the other end of the power cord into the AC power source receptacle.
Turn the circuit breaker on each unit to the ON position ( | ).
Proceed to
Installing the SF/CPM on page
C
ORD
Specification
Figure
24). The power cord retainer prevents the power cord
79.
Installing Power Modules
Page 77

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents