System Start-Up - EarthLinked AVS-0030-A Quick Start Instructions

Classic series sd (h) geothermal heating and cooling system
Table of Contents

Advertisement

System Start-Up

Evacuation
During the Evacuation and Initial Charging processes, be sure that ALL
power to the EarthLinked
compressor unit, air handler and all other electrically powered system
components.
Prior to system start-up, evacuation of the system is accomplished through the compressor unit. All
of the refrigerant containing components in the compressor unit are illustrated in Figures 24 and 25.
The evacuation and charging process will utilize an access port, initial charging port and final charging
port.
SD-410-QS (H) (06/15)
CAUTION!
®
System is OFF. This includes the
Figure 24. SD(H) Internal Flow Schematic
Page 35