EarthLinked AVS-0030-A Quick Start Instructions page 24

Classic series sd (h) geothermal heating and cooling system
Table of Contents

Advertisement

General guidelines for introducing propylene glycol into the water circulating system follow. The
manufacturer's specific instructions and industry standards always take precedence when introducing
propylene-glycol to the system.
 Calculate the quantity of inhibited propylene-glycol (fluid) required to achieve the
desired results.
 Introduce a sufficient quantity of water to the system and pressure check to ensure a
sealed system.
 Drain some water from the system to provide enough volume for the calculated
amount of fluid.
 Add the correct amount of fluid and any water needed to completely refill the system,
allowing for liquid expansion due to operating temperature.
 Circulate the inhibited propylene-glycol antifreeze solution for at least 24 hours to
ensure complete mixing. Check the liquid concentration to assure that the correct
mixture is obtained.
SD-410-QS (H) (06/15)
Page 24

Advertisement

Table of Contents
loading

Table of Contents