Figure 16. Anode Wire Insertion - EarthLinked AVS-0030-A Quick Start Instructions

Classic series sd (h) geothermal heating and cooling system
Table of Contents

Advertisement

Strip the insulation from the multi-strand anode wire back approximately ¾ inch from the end and,
while keeping the strands together, push the anode wire through the gland nut, gland cage, gland
and plug body as shown in Figure 16. Loosen one of the two screw terminals on the plug insert to
receive all of the strands of anode wire on one terminal.

Figure 16. Anode Wire Insertion

After inserting all strands of the anode wire into one of the terminals on the plug insert, tighten the
wire in place by tightening the screw on that terminal. Once tightened, push the plug insert back into
the plug body as shown in Figure 17 until it is firmly seated. Engage the locking ring with threads in
the plug body and turn clockwise with the sealing cap assembly tool until the lock ring is firmly
seated and tight against the plug insert.
SD-410-QS (H) (06/15)
Page 30

Advertisement

Table of Contents
loading

Table of Contents