Download Print this page

G-Tech FIELD MATE User Manual And Installation Manual page 5

Spreader rate controller and area meter

Advertisement

Start a Job
Note: This system is operated by either pressing and holding or quick pressing the
buttons.
1. Turn On the system using the power button.
2. Turn on the oil valve using the control valve switch ( mounted in cab from the FieldMate wiring loom).
3. At power up one of the following screens are displayed. One screen is a HOLD screen, the other screen
is a RUN spreading.
4. Clear any information from a previous job by holding the REST switch
for 5 seconds. Only job spreading information is reset, all other user
setting are unaffected.
Page 5
5 or 6or reset or power

Advertisement

loading