Installation
1) Power on RAID system.
2) Connect RAID system and Host with two Thunderbolt cables.
3) Power on Host and install Accusys Installer.
4) Create an array, check Assign LUN automatically and select 2 Thunderbolt host ports.
Note
T-Pairing does not support Hot-Plug and Fail-Over; If cable re-plugged,
have a host reboot can get T-Pairing function back automatically.
User Guide
1. Introduction
Page 3-7