Guidelines for Cable Connections

The procedure for cable connections is as follows:

Figure 31. Cable Connection Procedure

Cable Path Inspection

Cable Installation
Connector Attachment
Cable Binding
Identification Tag Attachment
When cutting the cable after installation, make sure that the connector is
disconnected. Installation of the cable with the connector connected to the system
may cause contact failure or damage to the connector assembled to the system and
the cable due to cable tension or the operator's mistakes.
The sequence of cable cutting and installation of the cable workflow can be changed
depending on the field situation such as 'cutting after installing' or 'installing after cutting'.
Cable Path Inspection
When installing a cable that connects between the rectifier, Main Ground Bar
(MGB), and backhaul device, and so on within the system, the cable path, length
and the cable installation method, and so on must be inspected.
Follow these guidelines when inspecting the cabling path.
RFD01F Series Installation Manual v1.0
© Samsung Proprietary and Confidential
Cable Cutting
When assembling the
A minimum cable length must be selected provided that it does not affect the
cable installation and maintenance.
connector at the site
Chapter 3 Connecting Cables
Connector Assembly
39