Installation

Selecting an Installation Option

In addition to the standard Powerware 9150, the UPS has an optional
PDM. Use the following flow chart to decide which installation option
is right for you.

UPS Installation

The Powerware 9150 has the following power connections:
:
:
The nominal input/output voltages are:
:
:
20
Do you have an
optional PDM?
No
See the following
section, "UPS
Installation."
2-phase (L1/A and L2/B), neutral, and ground connection for
rectifier/bypass input
2-phase (L1/A and L2/B), neutral, and ground connection for load
output
100/200, 110/220, or 120/240 Vac with 180
120/208 or 127/220 Vac with 120
Only qualified service personnel (such as a licensed electrician) should perform the
UPS installation and initial startup. Risk of electrical shock.
See "UPS with
Yes
Optional PDM
Installation"
on page 25.
phase displacement
W A R N I N G
Powerware
9150 User's Guide
®
phase displacement
:
www.powerware.com