RED PERFORMA 25 Installation Manual page 16

Pellet boilers
Table of Contents

Advertisement

2-INSTALLATION
ROOF AT 30°
A
ROOF AT 45°
B
A
ROOF AT 60°
B
C
A
14
B
C
C
D
E
45°
D
E
F
60°
D
E
30°
F
A = MIN. 1.30 metres
B = DISTANCE > 1.50 metres
C = DISTANCE < 1.50 metres
D = 0.50 metres ABOVE HIGHEST
POINT
E = 0.80 metres
F = REFLUX AREA
F
FIGURE 4
A = MIN. 2.00 metres
B = DISTANCE > 1.30 metres
C = DISTANCE < 1.30 metres
D = 0.50 metres ABOVE HIGHEST
POINT
E = 1.50 metres
F = REFLUX AREA
FIGURE 5
A = MIN. 2.60 metres
B = DISTANCE > 1.20 metres
C = DISTANCE < 1.20 metres
D = 0.50 metres ABOVE HIGHEST
POINT
E = 2.10 metres
F = REFLUX AREA
FIGURE 6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Performa 30Performa 25 easycleanPerforma 30 easyclean

Table of Contents