Emerson Fisher V150S Slurry Vee-Ball Instruction Manual page 8

Nps 3 through 12
Hide thumbs Also See for Fisher V150S Slurry Vee-Ball:
Table of Contents

Advertisement

V150S Slurry Vee-Ball Valve
July 2017
Figure 6. Packing Arrangements
PTFE V‐RING PACKING
FOR V150S
NOTE:
Includes zinc washers for graphite ribbon packing only.
1
28B5170
CAUTION
Trim parts are made from brittle material, handle with care to avoid chipping or breakage.
1. Remove the actuator cover (where applicable). Take note of the orientation of the actuator with respect to the
valve body and the lever orientation with respect to the valve drive shaft.
2. Remove the actuator.
3. Remove the flow ring retainer screws, clips and flow ring retainer (keys 22, 23, and 5).
4. Knock or press out the flow ring (key 4).
5. Position the ball to allow access to the shaft pins. Use a modified parallel pin punch (figure 7) to to knock out the
shaft pins, (key 10) through the shaft and ball lugs.
Note
The punch dimensions should be as per table 6 to avoid damaging the ball and shaft. The hole diameter in the ball is larger than
the hole in the shaft and the punch needs to be centrally located with the pin.
6. Remove packing follower (key 16). Remove plug (key 20) and spring (key 19).
7. Knock or press each shaft (key 9) out through the ball and the bearings (key 7).
8. Remove ball (key 3) and shrouds (key 6).
9. Knock, press, or pull out bearings (key 7).
10. Knock or press out body liner (key 2).
11. Remove packing (key 15).
8
PACKING FOLLOWER (KEY 16)
PACKING SET
(KEY 15)
PACKING
BOX RING (KEY 14)
STANDARD PACKING
PACKING FOLLOWER (KEY 16)
1
GRAPHITE RIBBON PACKING
FOR V150S
Instruction Manual
D103164X012
PACKING SET
(KEY 15)
PACKING
BOX RING (KEY 14)

Advertisement

Table of Contents
loading

Table of Contents