Beretta IDRA DS 200 Installation And User Manual

Beretta IDRA DS 200 Installation And User Manual

Solar storage cylinder

Advertisement

solar
storage
solar
cylinder
idra ds

installation ManUal

User ManUal

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IDRA DS 200 and is the answer not in the manual?

Questions and answers

Summary of Contents for Beretta IDRA DS 200

  • Page 1: Installation Manual

    solar storage solar cylinder idra ds installation ManUal User ManUal...
  • Page 2 MODEL CODE gned to give dependable and safe service and to provide comfort in the home for many years to come. Arrange for BERETTA IDRA DS 200 20001224 your solar storage cylinder to be serviced regularly BERETTA IDRA DS 300...
  • Page 3: Table Of Contents

    Contents contents general . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 1 General Safety Information .
  • Page 4: General

    GENERAL general safety inforMation PrecaUtions The operation of any appliance that uses electrical power Check that the product is complete, undamaged and demands that a number of fundamental safety precautions as ordered as soon as you receive it. Report any di- be respected.
  • Page 5: Description Of The Appliance

    IDRA DS Data plate This lists the technical specifications and performance of the product. Beretta Caldaie Via Risorgimento, 1323900 Lecco (LC) T067659ED02 SOLARBOILER SOLAR STORAGE CYLINDER Modell Herstell. Nr.
  • Page 6: Technical Specifications

    GENERAL tecHnical sPecifications IDRA DS DESCRIPTION 1000 Type of storage cylinder Vitrified Storage cylinder layout Vertical Heat exchanger layout Vertical Storage cylinder capacity Diameter of storage cylinder with insulation 1000 Diameter of storage cylinder without insulation Height with insulation 1330 1840 1630 1980...
  • Page 7 GENERAL Pressure drops TOP COIL PRESSURE DROP (mbar) Mod. 750 1000 Mod. 550 Mod. 430 Mod. 300 Mod. 200 1000 2000 3000 4000 FLOW RATE (l/h) Pressure drops BOTTOM COIL PRESSURE DROP (mbar) Mod. 1000 Mod. 750 Mod. 550 Mod. 430 Mod.
  • Page 8: Water Circuit

    GENERAL Water circUit TYPICAL WATER SYSTEM SCHEMATIC Solar regulator MI Dir MI Mix RI Dir RI Mix °C Boiler Water control system Solar collector Mixer valve Collector temperature sensor socket Domestic hot water outlet Manual bleed valve Domestic cold water inlet Vent cock Mixed central heating flow MI Mix...
  • Page 9: Location Of Sensors

    GENERAL location of sensors storage cylinders are equipped with dedicated sockets for the storage cylinder TEMPERATURE GAUGE IDRA DS or TEMPERATURE SENSOR. The installer is responsible for making all necessary connections to the boiler and solar collectors. Installers must use their expertise to ensure proper installation and functioning in compliance with all applicable legislation.
  • Page 10: Overall Dimensions And Water Fittings

    GENERAL overall diMensions and Water fittings 200 - 430 IDRA DS EAF (SB) (*) Cable routing IDRA DS DESCRIPTION Domestic hot water outlet 1” F Ø Outlet from boiler 1” F Ø Return to boiler 1” F Ø Outlet from solar collector 1”...
  • Page 11 GENERAL 300 - 550 IDRA DS EAF (SB) (*) Cable routing IDRA DS DESCRIPTION Domestic hot water outlet 1” F Ø Outlet from boiler 1” F Ø Return to boiler 1” F Ø Outlet from solar collector 1” M Ø Return to solar collector 1”...
  • Page 12 GENERAL 750 - 1000 IDRA DS EAF (SB) (*) Cable routing IDRA DS DESCRIPTION 1000 Domestic hot water outlet 1 ¼” M Ø Outlet from boiler 1” F Ø Return to boiler 1” F Ø Outlet from solar collector 1” M Ø...
  • Page 13: Installer

    INSTALLER 10 UnPacking tHe ProdUct MODELS IDRA DS 200 to 550 The second anode for installation instead of the in- storage cylinders are delivered in a single IDRA DS spection flange is supplied separately and must be package, protected by a cardboard box on a wooden pal- fitted by the installer.
  • Page 14: Handling

    INSTALLER 11 Handling Adjust the feet to ensure that the storage cylinder is per- MODELS IDRA DS 200 to 550 fectly level. Make sure that any lifting equipment is of adequate capa- city to lift and move the storage cylinder.
  • Page 15 INSTALLER If suitable equipment is not on hand to lift the storage cylin- The casing and insulation can be removed to facilitate ac- der off the pallet using the eyebolt, proceed as follows. cess into the place of installation. To do so, proceed as - Place a platform of about half the height of the pallet near follows.
  • Page 16: Place Of Installation

    INSTALLER 12 Place of installation 13 installation in older systeMs and systeMs storage cylinders can be installed in any IDRA DS reqUiring Modernisation room where there is no specific requirement for an electri- cal protection rating higher than IP X0D. When installing storage cylinders in old sy- IDRA DS...
  • Page 17: Technical Assistance Centre

    TECHNICAL ASSISTANCE CENTRE 14 PUtting into service 15 teMPorary sHUtdoWn It is essential to perform the following checks before star- If you are going away for a short period of time like a we- ting up or testing the functioning of the storage cylinder. In ekend or a short holiday, etc., and outdoor temperatures particular, check that: are going to remain above ZERO, proceed as follows.
  • Page 18: Maintenance

    INTERNAL CLEANING - Fill the storage cylinder’s DHW (secondary circuit) and MODELS IDRA DS 200 to 550 check that there are no leaks from any of the seals. - Check the performance of the storage cylinder. Removing and checking the magnesium anode - Remove the plug (1) and insulation (2), and use a sui- table wrench to unscrew the anode holder (3).
  • Page 19 TECHNICAL ASSISTANCE CENTRE MODELS IDRA DS 750 - 1000 Removing and checking the second magnesium anode - Remove the flange cover (5) and use a suitable wrench to unscrew the anode holder (6). Removing and checking the first magnesium anode If the magnesium anode is fitted in the top of the storage - Check the magnesium anode for wear and replace it if cylinder, remove the cover (1) and insulation (2), and use a...
  • Page 20: Recycling And Disposal

    TECHNICAL ASSISTANCE CENTRE 19 recycling and disPosal At the end of its useful working life, do not abandon the storage cylinder in the environment, but dispose of it through the proper channels in accordance with applicable legislation. 20 troUblesHooting SUPPLEMENTARY HEATING CIRCUIT FAULT CAUSE SOLUTION...
  • Page 21: End User

    END USER END USER INSTRUCTIONS Refer to the GENERAL SAFETY INFORMATION and PRECAUTIONS section for safety-related information. 21 start-UP 22 teMPorary sHUtdoWn The storage cylinder must be put into service for the first To reduce impact on the environment and save energy, time by personnel from the manufacturer’s Technical Assi- before leaving for the weekend or a short break, etc., pro- stance Centre.
  • Page 22 END USER...
  • Page 23 END USER...
  • Page 24 Via Risorgimento, 13 - 23900 Lecco (LC) - Italy Customer Service 199.13.31.31* www.berettaclima.it The manufacturer strives to continuously improve all products. Appearance, dimensions, technical specifications, standard equipment and accessories are therefore liable to modification without notice.

Table of Contents