Drain Hose - Samsung AR**MSWX series User And Installation Manual

Table of Contents

Advertisement

Step 1.3 Drilling a hole through the
wall
Before fixing the installation plate to a wall and
then fixing the indoor unit to the installation plate,
a window frame, or a gypsum board, you must
determine the position of a hole (with 2.56 inch(65
mm) inner diameter) through which the pipe bundle
(consisting of power and communication cables,
refrigerant pipes, and drain hose) will pass and then
drill that hole.
1 Determine the position of a 2.56 inch(65 mm) hole
in consideration of the possible directions of the
pipe bundle and the minimum distances between
the hole and the installation plate.
Left
<Possible directions of the pipe bundle>
CAUTION
If changing the pipe direction from left to right,
do not drastically bent it but slowly turn it in the
opposite direction as shown. Otherwise, the pipe
may be damaged in the process.
<Minimum distances between the hole and the
installation plate>
Model
A
09/12
1.42(36)
IBIM_EN.indd 39
Right
Rear right or left
Bottom right
Pipe bundle hole
(Unit : inch (mm))
B
C
D
4.72(120)
3.19(81)
1.42(36)
Pipe bundle hole: Ø2.56 inch (Ø 65mm)
2 Drill the hole.
CAUTION
Be sure to drill only one hole.
Make sure that the hole slants downwards so that
the drain hose slants downwards to drain water
well.
Indoor unit
<The hole slants downwards>
Step 1.4 Taping the pipes, cables, and

drain hose

1 Wrap foam insulation on parts without insulation
on the ends of the refrigerant pipes, as shown in
the figure. This wrapping minimises condensation
problem.
Insulation
Refrigerant pipes
2 Wind the refrigerant pipes, power cable,
communication cable and drain hose with vinyl
tape to make a pipe bundle.
Installation plate
Vinyl tape
Power and communication cables
(assembly cable)
Drain hose
Wall
Drain hose
Refrigerant pipes
(assembly pipe)
English
39
3/17/2017 10:01:47 AM

Advertisement

Table of Contents
loading

Table of Contents