Huawei BTS3900L Installation Manual page 94

Table of Contents

Advertisement

BTS3900L (Ver.C)
Installation Guide
3.
Issue 07 (2013-11-08)
Figure 11-23 Wrapping and tying the copper sheet of the ground clip
(1) Hole for a cable tie (12AWG/4 mm
Wrap three layers of waterproof tape and three layers of insulation tape around the ground
clip.
Figure 11-24 Wrapping the waterproof tape and insulation tape
(1) Waterproof tape
(4) Power cable
NOTICE
Trim off surplus part of the cable ties at the position 3 mm (0.12 in.) to 5 mm (0.20 in.)
away from the head of the cable tie.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2
2
or 0.006 in.
) (2) Hole for a cable tie (≥ 6 mm
(2) Insulation tape
(5) PGND cable
11 Installing the Cables
2
2
or 0.009 in.
)
(3) Cable tie
-
85

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bts3900l lteBts3900l wcdma

Table of Contents