Figure 8-16 Positions of the access holes in the support and holes in the ESD floor
(1) Mounting holes for the ESD floor
Mark the positions of the mounting holes on the concrete floor, as shown in
Figure 8-17 Marking the positions of the mounting holes
(1) Mounting hole for the
concrete floor
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
(2) ESD floor (3) Mounting hole for the concrete floor
(2) Concrete floor
8 Installing the Cabinet
Figure
8-17.
39