Important Safety Information - Mira Advance ATL Installation & User Manual

Electric shower 9.0 and 9.8 kw, adjustable temperature limit thermostatic
Hide thumbs Also See for Advance ATL:
Table of Contents

Advertisement

IMPoRTanT saFeTY InFoRMaTIon

Installation must be carried out in accordance with these instructions, and must be
conducted by designated, qualified and competent personnel.
WaRnInG!
Follow all warnings, cautions and instructions contained in this guide, and on or
inside the shower.
1.
This shower can deliver scalding temperatures if not operated, installed
or maintained in accordance with the instructions, warnings and cautions
contained in this guide and on or inside the appliance.
1.1. products manufactured by us are safe and risk-free, provided that they are
installed, used and maintained in good working order, in accordance with our
instructions and recommendations.
1.2. This product is suitable for installation within Zone 1 and is rated Ip X4.
1.3. Isolate the electrical and water supplies before commencing installation. The
electricity must be turned off at the mains and the appropriate circuit fuse
removed, if applicable.
1.4. Mains connections are exposed when the cover is removed.
1.5. refer to the wiring diagram before making any electrical connections.
1.6. Make sure all electrical connections are tight, to prevent overheating.
1.7. Make sure that any pipework that could become frozen is properly insulated. The
shower unit must not be fitted where it may be exposed to freezing conditions.
The water supplies to this product must be isolated if the product is not to be
used for a long period of time. If the product or pipework is at risk of freezing
during this period they should also be drained of water.
1.8. Do noT switch on if there is a possibility that the water in the shower is
frozen.
1.9. Do noT install the product in a position in which service access is restricted
1.10. Do noT commission this appliance if water leaks from the unit or the heater tank
pressure relief valve. If water leaks from the pressure relief valve, maintenance
will be required before the shower can be safely used.
1.11. Do noT fit any form of outlet flow control as the outlet acts as a vent for the
tank body. Only Mira recommended outlet fittings should be used.
1.12. This product is not suitable for areas with high humidity (i.e steam rooms).
please consult your installer.
1.13. ThIs aPPLIanCe MusT Be eaRTheD. MaKe suRe suPPLeMenTaRY
BonDInG CoMPLIes WITh The 'ReQuIReMenTs FoR eLeCTRICaL
InsTaLLaTIons'.
In accordance with the current edition of 'The plugs and Sockets etc. (Safety)
regulations in force at the time of installation, this shower is intended to be
permanently connected to the fixed electrical wiring of the mains system.
5
.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Advance atl thermostatic

Table of Contents