Installation Requirements; General; Plumbing - Mira Advance ATL Installation & User Manual

Electric shower 9.0 and 9.8 kw, adjustable temperature limit thermostatic
Hide thumbs Also See for Advance ATL:
Table of Contents

Advertisement

InsTaLLaTIon ReQuIReMenTs

General

This product works best when supply temperatures and pressures remain stable
and within the product specifications, refer to section 'Specifications'. If the supply
conditions fall outside the specifications, the shower may go into a safe shut down
condition.
If pipework and/or electrical cables enter the shower from the rear through a hole
in the wall provision must be made to prevent water ingress back into the wall
structure.

1. Plumbing

refer to section: 'Important safety Information' first.
1.1 Do not use sealing compounds on any pipe fittings or joints.
1.2 To avoid damage to the case when soldered fittings are used, pre-solder
the pipework and fittings before connecting them to the inlet connector
assembly.
1.3 Never fit the appliance to hot water supplies or to gravity systems of any
description. Only fit the product to a mains cold water pipe.
1.4 avoid layouts where the shower hose will be sharply kinked. This may reduce
the life of the hose.
1.5 Supply pipework MusT be flushed to clear debris before connecting the
appliance. debris will reduce the performance of the shower.
avoid running the pipework through excessively hot or cold areas such as hot
loft spaces, airing cupboards, or in close proximity to hot water pipes. If this
cannot be avoided, we would recommend insulating the pipes.
1.6 The appliance must be fitted onto the finished wall surface i.e. on top of the
tiles. Do noT tile up to the sides of the shower or use a sealant around the
case. Failure to do this may cause appliance failure. To ensure the case and
other components are not put under strain during installation always provide
mechanical support when making plumbing connections. Upon completion of
the installation ensure connections and back case are not under any stress
due to misaligned pipework or electrical cables.
1.7 We recommend that a non-restrictive (free flowing) isolating valve is fitted in
the cold water supply pipe to allow maintenance of the appliance.
1.8 When installed in very hard water areas (above 200 ppm temporary hardness)
your installer may advise the installation of a water treatment device, to reduce
the effects of limescale formation. any malfunction due to limescale is not
covered by the manufacturer's guarantee. Your local water company will be
able to advise the hardness of water in your area.
12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Advance atl thermostatic

Table of Contents