Basic Post Installation Checks - Mira Advance ATL Installation & User Manual

Electric shower 9.0 and 9.8 kw, adjustable temperature limit thermostatic
Hide thumbs Also See for Advance ATL:
Table of Contents

Advertisement

Basic Post Installation Checks

1.
T u r n o n e l e c t r i c a l
supply.
4.
Temperature to full cold.
7. push start/stop to turn off the
appliance. The pulsing light and
"beep" indicates that the appliance
is shutting down.
Important! Do noT isolate the
power to the appliance as this may
result in a temporary malfunction.
2.
Test shower drain pump
(if applicable).
OR
5.
Start shower to test for
water flow.
8. The appliance will purge water from
19
3.
power to appliance,
check start/stop for
blue light.
6.
If there is no water after
5 seconds, make sure
that the appliance has
been primed.
its tank for a few seconds.
Important! Do noT isolate the
power to the appliance.
Go to section: 'Commissioning'.
5 secs

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Advance atl thermostatic

Table of Contents