Troubleshooting - DeWalt DXAEC80 Instruction Manual

30a bench battery charger with 80a engine start
Table of Contents

Advertisement

Available languages

Available languages

Troubleshooting

Problem
Unit fails to turn on
Unit fails to charge
AC Pass Through
will not power
appliance
DXAEC80_DXAEC80CA_ManualENFRSP_082616.indd 25
Possible Solution
Check that the charger is properly
connected to a live 120 volt AC outlet.
Check that the charger is properly
connected to a live 120 volt AC outlet.
If the battery to be charged has fallen
below 2 volts, the battery cannot be
recharged with this charger.
Make sure a proper polarity cable
connection has been established.
Check that the battery charger is properly
connected to a live 120 volt AC Outlet.
Make sure the appliance is properly
connected to the AC Pass Through and
that the appliance is turned on.
Mark sure that the total draw of the AC
appliance connected to the AC Pass
Through does not exceed 700W.
Check that the fuse inside the fuse holder
at the back of the unit is not blown.
Replace the fuse with the same type and
size (250V / 6A) if it is blown.
Problem
Possible Solution
USB Port will not
Make sure the USB Power Button has
power appliance
been turned on.
Make sure the USB Power/Fault Indicator
lights solid blue. If a fault condition exists
in the USB Port, the USB Power/Fault
Indicator will flash blue. Refer to the
Important Notes in the "Using the USB
Port" section to remedy any faults.
Make sure that the draw of the USB
device plugged into the USB Port does
not exceed 5V/3.1A.
Some USB-powered household electronics
will not operate with this USB charging/
power port. Check the manual of the
corresponding electronic device to confirm
that it can be used with this type of USB
charging/power port.
The Bank 2 DC Cable
Make sure the appliance is properly
Connectors will not
connected to the Bank 2 Cable Connectors
power appliance
following the appliance manufacturer's
guidelines; and make sure it is turned on.
Make sure to press and hold both the
Single/Multi-Bank Selection Button and the
Alternator Check Button simultaneously for
3 seconds until the POWER Indicator on
the LCD Screen has lit.
25
10/19/2016 3:58:07 PM

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dxaec80ca

Table of Contents