4 Installation

The DIN rail should be mounted horizontally so that the unit's ventilation holes are vertical in relation to
cabinet orientation. A minimum clearance of 1 inch (25.4 mm) should be maintained above and below all
units in order to ensure proper thermal regulation. Also ensure that enough cable clearance is allowed at
the front of the Gateway to allow cable connections to the Gateway's interface ports.