Grounding the switch by using the PE wire of the AC power cord ··························································· 13 Installing and removing a power supply (HPE 5130 24G SFP 4SFP+ EI switch) ············································ 13 Installing a power supply ·························································································································· 14 ...
To avoid ESD damage, wear an ESD wrist strap to hot-swap a power supply. Examining the installation site The HPE FlexNetwork 5130 EI switches must be used indoors. You can mount your switch in a rack or on a workbench, but make sure: •...
Temperature/humidity Maintain temperature and humidity in the equipment room as described in "Technical specifications." • Lasting high relative humidity can cause poor insulation, electricity leakage, mechanical property change of materials, and metal corrosion. • Lasting low relative humidity can cause washer contraction and ESD and cause problems including loose mounting screws and circuit failure.
WARNING! Do not stare into any fiber port when the switch has power. The laser light emitted from the optical fiber might hurt your eyes. The HPE FlexNetwork 5130 EI switches are Class 1 laser devices. Installation tools • Flat-blade screwdriver •...
Page 9
HPE 5130 24G PoE+ 2SFP+ 2XGT (370W) 5184-6729 • HPE 5130 48G PoE+ 2SFP+ 2XGT (370W) • HPE 5130 24G PoE+ 4SFP+ (370W) EI BR • HPE 5130 48G PoE+ 4SFP+ (370W) EI BR DC power cord (supplied with the...
Installing the switch CAUTION: Keep the tamper-proof seal on a mounting screw on the chassis cover intact, and if you want to open the chassis, contact Hewlett Packard Enterprise for permission. Otherwise, Hewlett Packard Enterprise shall not be liable for any consequence. Figure 1 Hardware installation flow Installing the switch in a 19-inch rack Mounting brackets...
Attaching the mounting brackets to the switch The HPE 5130 24G 4SFP+ EI, HPE 5130 24G 4SFP+ EI BR, HPE 5130 48G 4SFP+ EI BR, HPE 5130 24G PoE+ 4SFP+ (370W) EI BR, HPE 5130 24G PoE+ 4SFP+ (370W) EI, HPE 5130 24G...
Page 12
(near the power supplies). The HPE 5130 48G PoE+ 4SFP+ (370W) EI, HPE 5130 48G PoE+ 4SFP+ (370W) EI BR, HPE 5130 24G PoE+ 2SFP+ 2XGT (370W) EI, HPE 5130 48G PoE+ 2SFP+ 2XGT (370W) EI, and HPE 5130...
(user-supplied) to the rack. Verify that the switch chassis is horizontal and secure. Figure 9 Mounting an HPE 5130 24G SFP 4SFP+ EI switch by the front mounting position...
Figure 10 Mounting an HPE 5130 24G SFP 4SFP+ EI switch by the rear mounting position Figure 11 Mounting an HPE 5130 24G SFP 4SFP+ EI switch by the mid-mounting position Mounting the switch on a workbench IMPORTANT: • Ensure 10 cm (3.9 in) of clearance around the chassis for heat dissipation.
Grounding the switch WARNING! Correctly connecting the switch grounding cable is crucial to lightning protection and EMI protection. The power input end of the switch has a noise filter, whose central ground is directly connected to the chassis to form the chassis ground (commonly known as PGND). You must securely connect this chassis ground to the earth to minimize the potential for system damage, maximize the safety at the site, and minimize EMI susceptibility of the system.
(1) Chassis rear panel (2) Grounding sign (3) Grounding hole (4) Ring terminal (5) Grounding cable (6) Grounding screw Connect the other end of the grounding cable to the grounding strip. a. Cut the grounding cable to a length according to the distance between the switch and the grounding strip.
Provide a circuit breaker for each power supply and make sure the circuit breaker is off before installation. The HPE 5130 24G SFP 4SFP+ EI switch provides two power supply slots and comes with power supply slot 1 empty and a filler panel in power supply slot 2. You can install one power supply, or two power supplies for redundancy.
Figure 16 Installation procedure Figure 17 Removal procedure installation removal procedures same PSR150-A/PSR150-A1(JD362A/JD362B) and PSR150-D/PSR150-D1(JD366A/JD366B) power supplies. This guide uses the PSR150-A1 (JD362B) power supply as an example. Installing a power supply Wear an ESD wrist strap and make sure it makes good skin contact and is reliably grounded. Unpack the power supply and verify that the power supply model is as required.
Connecting the switch to models: A-RPS800 (JD183A ) an RPS and A-RPS1600 (JG136A) • HPE 5130 24G PoE+ 4SFP+ (370W) EI Connecting the switch to AC power source an AC power source • HPE 5130 48G PoE+ 4SFP+ (370W) EI...
Connecting the switch to HPE A-RPS1600 an RPS The HPE 5130 24G SFP 4SFP+ EI switch provides two power supply slots. The PSR150-A/PSR150-A1 (JD362A/JD362B) and PSR150-D/PSR150-D1 (JD366A/JD366B) power supplies are available for the HPE 5130 24G SFP 4SFP+ EI switch. The PSR150-A/PSR150-A1...
Connecting the switch to a –48 VDC power source CAUTION: • You can only use an HPE DC power cord to connect the switch to a –48 VDC power source. • The power cord color code scheme in Figure 23 is for illustration only.
Figure 23 Connecting the DC power cord to an HPE 5130 24G SFP 4SFP+ EI switch Connecting the switch to an RPS CAUTION: To connect the switch to an HPE RPS, you can only use the power cord that is provided with the RPS. To connect the switch to an RPS:...
Verifying the installation After you complete the installation, verify that: • There is enough space for heat dissipation around the switch, and the rack or workbench is stable. • The grounding cable is securely connected. • The correct power source is used. •...
Accessing the switch for the first time Setting up the configuration environment The first time you access the switch you must use a console cable to connect a configuration terminal, for example, a PC, to the console port on the switch, as shown in Figure Figure 25 Connecting the console port to a terminal Connecting the console cable...
After the startup completes, you can access the CLI to configure the switch. For more information about the configuration commands and CLI, see HPE FlexNetwork 5130 EI Switch Series Configuration Guides and HPE FlexNetwork 5130 EI Switch Series Command...
Setting up an IRF fabric You can use HPE IRF technology to connect and virtualize HPE FlexNetwork 5130 EI switches into a large virtual switch called an "IRF fabric" for flattened network topology, and high availability, scalability, and manageability. IRF fabric setup flowchart...
IRF fabric at the CLI of the master switch. IRF member switches automatically elect a master. You can affect the election result by assigning a high member priority to the intended master switch. For more information about master election, see HPE FlexNetwork 5130 EI Switch Series IRF Configuration Guide.
IRF-port 1 on one switch to the physical ports of IRF-port 2 on the other switch. The HPE FlexNetwork 5130 EI switches can provide 10-GE IRF connections through 1/10 GE Ethernet ports or SFP+ ports, and you can bind several 1/10 GE Ethernet ports or SFP+ ports to an IRF port for increased bandwidth and availability.
Page 29
As a best practice, use ring topology to connect the switches. The following describes cabling schemes in ring topology. Connecting the IRF member switches in one rack Use SFP+ cables to connect the IRF member switches (9 switches in this example) in a rack as shown in Figure 30.
• Execute the display irf configuration command to verify the basic IRF settings. For more information about configuring basic IRF settings, see HPE FlexNetwork 5130 EI Switch Series IRF Configuration Guide. Connecting the physical IRF ports Use twisted pair cables, SFP+ cables, or SFP+ transceiver modules and fibers to connect the IRF member switches as planned.
Create a Layer 3 interface, assign it an IP address, and make sure the IRF fabric and the remote network management station can reach each other. Use Telnet or SNMP to access the IRF fabric from the network management station. (See HPE FlexNetwork 5130 EI Switch Series Fundamentals Configuration Guide.) Verify that you can manage all member switches as if they were one node.
Maintenance and troubleshooting Fixed power supply failure The HPE 5130 24G 4SFP+ EI, HPE 5130 24G 2SFP+ 2XGT EI, and HPE 5130 24G 4SFP+ EI BR switches use fixed power supplies and support only AC power input. The HPE 5130 24G PoE+ 4SFP+ (370W) EI, HPE 5130 48G 4SFP+ EI, HPE 5130 24G PoE+...
Solution To resolve the problem: Verify that the switch is securely connected to the RPS. Verify that the RPS is operating correctly. Verify that the operating temperature of the switch is in the acceptable range, and the power supply has good ventilation. Over-temperature can cause the power supply to stop working and enter the protection state.
Hot-swappable power supply failure The HPE 5130 24G SFP 4SFP+ EI switch uses hot-swappable power supplies. You can determine the power supply operating status by examining the power supply LEDs PWR1 and PWR2 on the switch front panel. For descriptions about the PWR1 and PWR2 LEDs, see "Appendix C Ports and...
Page 35
Solution To resolve the problem: Verify that the following settings are configured for the terminal: Baud rate—9600. Data bits—8. Parity—None. Stop bits—1. Flow control—None. If the problem persists, contact Hewlett Packard Enterprise Support.
Appendix A Chassis views and technical specifications Chassis views HPE 5130 24G 4SFP+ EI/HPE 5130 24G 4SFP+ EI BR Figure 33 Front panel (1) 10/100/1000Base-T autosensing Ethernet port (2) SFP+ port (3) Console port (4) 10/100/1000Base-T autosensing Ethernet port (5) SFP+ port LED...
(3) Power supply slot 2 The HPE 5130 24G SFP 4SFP+ EI switch comes with no power supply or filler panel in power supply slot 1 and a filler panel in power supply slot 2. You can install one or two power supplies for the switch as needed.
DC power source: –48 V DC power source in the Max voltage: 90 VAC to 264 equipment room or RPS (recommended HPE VAC @ 47 to 63 Hz RPS models: A-RPS800 or A-RPS1600) Rated voltage: –48 VDC to –60 VDC •...
Page 43
HPE 5130 24G HPE 5130 48G HPE 5130 HPE 5130 HPE 5130 4SFP+ EI 4SFP+ EI Item 24G 2SFP+ 24G SFP 48G 2SFP+ HPE 5130 24G HPE 5130 48G 2XGT EI 4SFP+ EI 2XGT EI 4SFP+ EI BR 4SFP+ EI BR Maximum •...
Page 44
VAC @ 50 or Max voltage: 90 VAC to 264 VAC @ 47 to 63 Hz 60 Hz Input • DC power source: HPE A-RPS1600 • voltage Max voltage: Rated voltage: –54 VDC to –57 VDC 90 VAC to 264 •...
Appendix B FRUs The HPE 5130 24G SFP 4SFP+ EI switch provides two power supply slots. One power supply can meet the power requirement of the switch. You can install two power supplies on the switch for redundancy. Table 11 describes the power supplies available for the HPE 5130 24G SFP 4SFP+ EI switch.
Keep the device and twisted pair cables away from the interference source, such as a two-way radio and a high-power variable-frequency drive. 100/1000Base-X SFP port The HPE 5130 24G SFP 4SFP+ EI switch provides 24 100/1000Base-X SFP ports, and you can install the 100 Mbps SFP transceiver modules in Table 15...
Page 48
(nm) (µm) (MHz × km) n distance 550 m (1804.46 ft) Multi-mode, 50/125 500 m HPE X120 1G (1640.42 ft) JD118B SFP LC SX 275 m (902.23 Transceiver Multi-mode, 62.5/125 220 m (721.78 Single-mode, 10 km (6.21...
As a best practice, use HPE 1000 Mbps SFP transceiver modules, SFP+ transceiver modules, or SFP+ cables for the SFP+ ports on the switch. The HPE 1000 Mbps SFP and SFP+ transceiver modules are subject to change over time. For the most up-to-date list of SFP and SFP+ transceiver modules, contact your Hewlett Packard Enterprise sales representative or technical support engineer.
Some ports have failed POST. The switch is powered off. Power supply status LED The HPE 5130 24G SFP 4SFP+ EI switch provides the PWR1 and PWR2 LEDs on the front panel to indicate the operating status of the power supplies.
No power supply is installed in the power supply slot. RPS status LED The HPE 5130 48G 2SFP+ 2XGT EI, HPE 5130 24G PoE+ 2SFP+ 2XGT (370W) EI, HPE 5130 48G PoE+ 2SFP+ 2XGT (370W) EI, HPE 5130 24G PoE+ 4SFP+ (370W) EI, HPE 5130 24G PoE+...
Page 52
The port is not supplying PoE. • The HPE 5130 24G 2SFP+ 2XGT EI, HPE 5130 24G PoE+ 2SFP+ 2XGT (370W) EI, HPE 5130 24G 4SFP+ EI, HPE 5130 24G 4SFP+ EI BR, HPE 5130 24G PoE+ 4SFP+ (370W) EI, and...
Page 53
HPE 5130 24G PoE+ 4SFP+ (370W) EI BR switches provide two single-color LEDs for each 10/100/1000Base-T autosensing Ethernet port to indicate its operating status. Table 24 Description for the two single-color LEDs for the 10/100/1000Base-T autosensing Ethernet port Port mode...
1/10GBase-T autosensing Ethernet port LEDs • The HPE 5130 48G 2SFP+ 2XGT EI and HPE 5130 48G PoE+ 2SFP+ 2XGT (370W) EI switches provide a double-color (green and yellow) LED for each 1/10GBase-T autosensing Ethernet port to indicate its operating status.
The HPE 5130 48G 2SFP+ 2XGT EI, HPE 5130 48G PoE+ 2SFP+ 2XGT (370W) EI, HPE 5130 24G SFP 4SFP+ EI, HPE 5130 48G 4SFP+ EI, HPE 5130 48G 4SFP+ EI BR, HPE 5130 48G PoE+ 4SFP+ (370W) EI, and HPE 5130 48G PoE+ 4SFP+ (370W) EI BR switches provide a...
Page 56
The HPE 5130 24G 2SFP+ 2XGT EI, HPE FlexNetwork 5130 24G PoE+ 2SFP+ 2XGT (370W) EI, HPE 5130 24G 4SFP+ EI, HPE 5130 24G 4SFP+ EI BR, HPE 5130 24G PoE+ 4SFP+ (370W) EI, and HPE 5130 24G PoE+ 4SFP+ (370W) EI BR switches provide two single-color LEDs for each SFP+ port to indicate its operating status.
Appendix D Cooling system The cooling system of the switch includes the air vents in the chassis and fixed fans. To maintain good ventilation for the switch, consider the ventilation design at the installation site when you plan the installation position for the switch. Figure 52 Airflow through the chassis...
Document conventions and icons Conventions This section describes the conventions used in the documentation. Port numbering in examples The port numbers in this document are for illustration only and might be unavailable on your device. Command conventions Convention Description Bold text represents commands and keywords that you enter literally as shown. Boldface Italic text represents arguments that you replace with actual values.
Convention Description An alert that provides helpful information. TIP: Network topology icons Convention Description Represents a generic network device, such as a router, switch, or firewall. Represents a routing-capable device, such as a router or Layer 3 switch. Represents a generic switch, such as a Layer 2 or Layer 3 switch, or a router that supports Layer 2 forwarding and other Layer 2 features.
Support and other resources Accessing Hewlett Packard Enterprise Support • For live assistance, go to the Contact Hewlett Packard Enterprise Worldwide website: www.hpe.com/assistance • To access documentation and support services, go to the Hewlett Packard Enterprise Support Center website: www.hpe.com/support/hpesc Information to collect •...
For more information and device support details, go to the following website: www.hpe.com/info/insightremotesupport/docs Documentation feedback Hewlett Packard Enterprise is committed to providing documentation that meets your needs. To help us improve the documentation, send any errors, suggestions, or comments to Documentation Feedback (docsfeedback@hpe.com). When submitting your feedback, include the document title,...
Page 62
part number, edition, and publication date located on the front cover of the document. For online help content, include the product name, product version, help edition, and publication date located on the legal notices page.
Index troubleshooting configuration terminal Numerics problems, 10/100/1000 Base-T Ethernet verify the IRF fabric setup, port, connecting port LED, AC power source, 100/1000Base-X SFP console cable, port, first time switch access, port LED, IRF member switches in a ToR solution, 19-inch rack IRF member switches in one rack, switch installation, IRF physical ports,...
Page 64
securing AC power cord for hot-swappable AC connecting AC power source, power supply, connecting RPS, troubleshooting fixed power supply failure, console port technical specifications, troubleshooting hot-swappable power supply grounding switch, failure, grounding switch through AC power supply PE electromagnetic interference. See EMI prevention wire, EMI prevention,...
Page 65
switch on 19-inch rack, troubleshooting configuration terminal problems, tools, troubleshooting the switch, IRF fabric networking configuring basic settings, planning IRF cabling scheme, connecting member switches in a ToR solution, no terminal display (troubleshooting), connecting member switches in one rack, connecting physical ports, parity (parameter), identifying master switch, PE wire,...
Page 66
grounding switch with grounding conductor installation site cleanliness, buried in the earth ground, installation site dust concentration, grounding switch with grounding strip, installation site gas saturation, grounding the switch, installation site humidity, identifying IRF master switch, installation site temperature, identifying IRF member switch physical laser safety recommendations, ports, recommendations,...
Page 67
technical specifications, VT100, troubleshooting, troubleshooting the switch, workbench verifying 19-inch rack installation, mounting switch, workbench mounting switch, system administration troubleshooting configuration terminal problems, troubleshooting fixed power supply failure, troubleshooting hot-swappable power supply failure, system status LED, technical specifications, 10/100/1000 Base-T Ethernet port, 10/100/1000 Base-T Ethernet port LED, 100/1000Base-X SFP LED, 100/1000Base-X SFP port,...