Installation; Preliminary Run - Panasonic MIR-H163-PA Service Manual

Heated incubator mir-h163 series; mir-h263 series
Table of Contents

Advertisement

INSTALLATION

1. Remove the packaging materials and tapes
Remove all transportation packaging materials and tapes. Open the doors and ventilate the unit. If the
outside panels are dirty, clean them with a neutral detergent and wipe it up with a wet cloth.
Note:
Remove the cable tie banding the power supply cord. Prolonged banding may cause the corrosion of
the cord coating.
2. Adjust the leveling feet
Extend the leveling feet by rotating them counterclockwise so that they contact with a floor or a bench.
Ensure the unit is level.
3. Ground (earth)
WARNING
Use a power supply outlet with ground (earth) to prevent electric shock. If the power supply outlet is
not grounded, it is necessary to install a ground by qualified engineers.
Never ground the unit through a gas pipe, water main, telephone line or lightning rod. Such
grounding may cause electric shock in the case of an incomplete circuit.

PRELIMINARY RUN

When using the unit for the first time after purchasing, operate the unit without any object inside it.
1. Install the racks in the chamber.
2. Set the temperature at 80
3. Leave the unit until the chamber temperature is cool enough.
4. Ventilate the room when opening the chamber door as the smoke with a strong odor is exhausted.
5. Keep the chamber door open for a while until the odor is eliminated.
Note:
Some odors may be remained after the preliminary run. Such residue is eliminated gradually during
usage.
• With the use of a unit, the inner surfaces, shelves and the separation plate may be discolored by smoke
generated inside a unit. This is a natural discoloration.
• This unit has been tested at the factory before shipping. Therefore, light lines and/or discoloration may
be detected even though the unit is a new one.
o
C and operate the unit for 20 minutes.
-33-
13

Advertisement

Table of Contents
loading

Table of Contents