Steps - commissioning, inspection and maintenance
For further information regarding the individual steps, see the page indicated
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Commissioning steps
Inspection steps
Maintenance steps
1. Checking the high limit safety cut-out setting.............
2. Filling the heating system with water and venting the
system.............................................................................
3. Filling siphon with water................................................
4. Starting the heating system...........................................
6. Conversion to natural gas LL........................................
8. Checking the CO
9. Checking the CO content
10. Checking the flue gas temperature
13. Opening the boiler door................................................. 20
14. Separating the neutralising system (if installed) from
the boiler and connecting the drain hose.................... 20
15. Cleaning the combustion chamber and heating
surfaces........................................................................... 20
16. Checking gaskets and thermal insulation
components.................................................................... 21
17. Checking all heating water connections and the
18. Cleaning and reconnecting the condensate drain
system............................................................................. 22
19. Checking the condensate drain and the neutralising
Commissioning, inspection, maintenance
content............................................. 14
2
Page
7
7
7
7
9
9
5