How To Extend The Control Unit Cable (Option) - Furuno FAR-3230S(-BB) Installation Manual

Chart radar
Hide thumbs Also See for FAR-3230S(-BB):
Table of Contents

Advertisement

2. WIRING
2.9

How to Extend the Control Unit Cable (option)

To extend the length of the cable between a control unit and the processor unit, use
the optional cable assy 6TPSH-XH12X2-LxxSP1 (for RCU-024) or 6TPSH-XH12X2-
LxxSP2 (for RCU-026). You can select the cable length among 10, 20 and 30 m.
2.9.1
RADAR control unit (RCU-025)
1. Unfasten 12 binding screws (M3×8) from the bottom of the control unit to remove
the cover.
Note: Remove the cover slowly to prevent damage to the cables connected to the
circuit board in the control unit.
2. Unfasten two pan head screws (M3×12) to remove the clamp and cable clamp
from the control unit.
3. Disconnect the control unit cable from the J1 connector.
4. Pull out the control unit cable from the cover.
5. Pass the optional cable assy (6TPSH-XH12X2-LxxSP1) through the cable hole on
the control unit.
6. Fasten the shield part of the cable assy with the cable clamp (removed at step 2),
then connect the connector at the end of the cable assy to the J1 on the circuit
board inside the unit.
7. Reattach the control unit cover, referring to step 1.
8. Unfasten four screws (M4×8) to remove the processor unit cover.
2-48
Binding screw
J1 connector
Clamp
Cable clamp
Control unit cable

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Far-3330sFar-3 seriesFar-3bb seriesFar-3230sFar-3230s-bb

Table of Contents