Removing the system from the rack
12
Figure 6: Routing the cables
20
•
Bundle the cables gently, pulling them clear of the system connectors to the left and
right sides (19).
•
Thread the Velcro straps through the tooled slots on the outer or inner CMA
brackets on each side of the system to secure the cable bundles (20).
To remove the system from the rack
1 Locate the lock levers on the front ends of both inner rails (1).
18
FortiAnalyzer-2000B Version 4.0 MR1 Rack and Hardware Install Guide
Rack Installation Instructions
19
http://docs.fortinet.com/
Revision 1
•
Feedback