Comelit PLANUX MANAGER Manual page 13

Hide thumbs Also See for PLANUX MANAGER:
Table of Contents

Advertisement

LOADS
LOAD SCHEDULING
Once you have entered the relevant area, press the
icon and then the icon corresponding to one of the
loads available (e.g. Bedside Table socket); this will
take you to the load scheduling menu.
Thur 05/09/09 - 16:07 0W
M
M
T
W
3
PROG
1 Days of the week.
2 List of logged programming.
3 Start programming.
Press the
icon to access the programming screen.
PROG
Thur 05/09/09 - 16:07 0W
M
T
W
STOP
T
F
S
S
TIME
ON
STATE
STATE
T
F
S
S
ON
STATE
STATE
TIME
+
x
Select the days of the week for which you wish to
program the activity (selected days will be highlighted
in red) and press the
schedule to the list.
Thur 05/09/09 - 16:07 0W
M
T
1
7
STOP
6
-
00:00
2
5
1 Days of the week selected.
2 Logged programming.
3 Add programming.
4 Delete programming.
5 Confirm.
6 Selector keys to modify time and status.
7 Log.
Set the desired activity time using the selector keys
and press the
status and press
steps as necessary to add several programming
schedules. To delete a programming schedule, select
it and press the
When you have finished, press the
information.
13
+
icon to add a programming
W
T
F
S
ON
STATE
STATE
TIME
00:00
OFF
+
icon to confirm. Select the desired
to confirm. Repeat the above
x
icon, followed by
icon to log the
STOP
S
1
2
+
+
3
x
4
to confirm.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PLANUX MANAGER and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents