Duct Connections; Condensate Drain Connections - Trane UCCA Installation, Operation And Maintenance Manual

Performance climate changer
Table of Contents

Advertisement

Figure 21. Angle filter arrangement
Size 3
5.60 ft²
5.00
16
25
16
25
30.00
Size 12
21.70 ft²
2.00
16
16
16
25
20
20
16
16
16
25
20
20
16
16
16
25
20
20
67.00
Size 21
31.10 ft²
5.00
16
16
16
25
25
20
16
16
16
25
25
20
16
16
16
25
25
20
16
16
16
25
25
20
75.00

Duct Connections

All duct connections to the air handlers should be installed
in accordance with the standards of the National Fire
Protection Association (NFPA):
NFPA 90A for installing air conditioning and ventilating
systems other than residence type.
NFPA 90B for residence-type warm air heating and air-
conditioning systems.
CLCH-SVX009A-EN
Size 6
11.10 ft²
3.00
20
20
20
20
20
20
20
20
43.00
Size 14
21.70 ft²
16
16
25
16
16
25
16
16
25
67.00
Size 25
41.70 ft²
20
20
25
20
20
25
20
20
25
20
20
25
77.00
Size 8
12.50 ft²
2.00
20
20
20
25
20
20
25
20
47.00
2.00
16
20
20
16
20
20
16
20
20
2.00
20
25
25
20
25
25
20
25
25
20
25
25
See unit submittal documentation for additional duct
mounting information.

Condensate Drain Connections

The main drain line and the trap must be the same size as
the drain connection. Drain traps must be primed. If they
are not, the trap is essentially non-existent and the drain
will likely overflow. Plug or trap the auxiliary drain
connection, if applicable. If the auxiliary drain connection
is left open, air can be drawn in through the opening. This
drawn in air can cause moisture carryover. All drain lines
Installation - Mechanical
Size 10
15.60 ft²
3.00
20
20
20
20
20
16
20
20
20
16
20
20
59.00
Size 17
30.00 ft²
3.00
20
20
20
20
20
20
16
20
20
20
20
20
20
16
20
20
20
20
20
20
16
75.00
Size 30
48.90 ft²
20
20
20
20
20
20
16
16
20
20
20
20
16
16
20
20
20
20
20
20
16
16
20
20
20
20
20
20
20
20
16
16
90.00
16
16
16
2.00
20
16
20
16
20
16
20
16
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents