ABB S800 I/O User Manual page 7

Hide thumbs Also See for S800 I/O:
Table of Contents

Advertisement

Figure 1-7.
Figure 1-8.
Figure 1-9.
Figure 1-10. Example of Connection between S800 I/O and Intrinsic Safety System
Figure 1-11. Example of Connection between S800 I/O and Intrinsic Safety System
Figure 2-1.
Figure 2-2.
Figure 2-3.
Figure 2-4.
Figure 2-5.
Figure 2-6.
Figure 2-7.
Figure 2-8.
Figure 2-9.
Figure 2-10. MTU Mechanical Keys for I/O Module and Module Lock......................36
Figure 2-11. TB807 ModuleBus Terminator Installation ..............................................37
Figure 2-12. I/O Station Layout with FCI and S800 I/O Modules................................37
Figure 2-13. I/O Station Layout with ModuleBus Modem and S800 I/O Modules ......38
Figure 2-14. Compact and Extended MTU and Horizontal and Vertical Mounting .....38
Figure 2-15. Grounding of Electronic Equipment.........................................................40
Figure 2-16. Recommended Field Cable Wiring Distances ..........................................43
Figure 2-17. Minimum Distance to Cabinets ................................................................46
Figure 2-18. Minimum Distance from Rear and Side of Cabinet to a Wall ..................46
Figure 2-19. Enclosure with 12 Modules and Redundant Station Power Supplies .......47
Figure 2-20. Power Supply Connection and Distribution .............................................52
Figure 2-21. Block Diagram of S800 I/O Input Channel, Test Points...........................66
Figure 2-22. Block Diagram of S800 I/O Output Channel, Test Points ........................68
Figure 3-1.
3BSE 020 923R101
DGGVTUS6UDPITÃp‚‡vˆrq
Installation Using Single Power Supply Unit ...........................................15
Installation Using Redundant Power Supply Units ..................................16
RE810 Cabinet with 12 I/O Modules and Redundant Station
Power Supplies .........................................................................................17
from ELCON ............................................................................................18
from ELCON and HART Multiplexer Interface from HART ..................19
MTU Latching System..............................................................................27
I/O Station Installation Diagram ...............................................................28
ModuleBus Release ..................................................................................29
Redundant CI820 FCIs and TB815 Interconnection Unit Layout ............30
Connection of Redundant FCIs to I/O Modules .......................................31
ModuleBus Extension Cable Connections ...............................................32
Location of TB810/TB811 ModuleBus Optical Port in CI810 FCI .........33
Location of TB810/TB811 ModuleBus Optical Port on the TB815.........34
Optical ModuleBus Expansion, Simplex and Duplex Configurations .....35
Maximum Layout of I/O Cluster with Compact MTUs ...........................72
Brr…hyÃDs‚…€h‡v‚ÃhqÃD†‡hyyh‡v‚ÃV†r…¶†ÃBˆvqr
UhiyrÂsÃ8‚‡r‡†
v

Advertisement

Table of Contents
loading

Table of Contents