After some general information in the following section, you will find individual
setup descriptions for different parts of the system. The information is given under
the following headings if relevant
•
•
•
•
Standard installation drawings, terminal diagram forms, and connection documents
for site preparation and installation of electrical equipment may apply also.
@vrÃSrv
rq
The following is a minimum requirement:
•
•
•
•
!!
ThsrÃSrtyhv
The following instructions are to be followed when installing and operating an S800
I/O system to minimize the risks of injury to personnel and damage to the
equipment. Local statutory regulations, to the degree that they are more strict than
the following are to take precedence.
!!
Qr
ryÃThsr
The following are to be observed:
•
48
Assembly
Electric Installation (including Power Supply)
Functional Measures
Preparation for Start Up.
Ordinary hand tools
Universal instrument, for example, digital multimeter.
Necessary parts of the documentation listed in
Documentation.
Specific documentation enclosed with the equipment, drawings and so on.
Voltage supply of a cabinet shall never be switched on during installation work.